Construction, disassembly and reassembly of internal floating roof of 5 x 5000 m3 tanks
Sandblasting and painting works of 5 x 5000 m3 tanks
Inside site pipe welding, maintenance and painting works
Kar Group Khormala Pump Station (KPS)
Pump, valve and fitting maintenance and painting works with special paint
Adminnistration building renovation and additional co instruction works
2019 - 2021
Kar Group II (Kwergosk) Refinery pipe insulation works.
Kar Group I (Kwergosk) Refinery works.
Replacement and renewal of stainless steel seals of external floating roof of 3000 m3 tanks.
Installation and turnkey delivery of foam powder system.
Replacement of bottom plate and fixed roof of 2000 m3 tank
Installation and turnkey delivery of foam chamber for fire-fighting system.
Sandblasting and paint works of 2 x 2000 m3 tanks
Installation and turnkey delivery of foam system with foam chamber for fire-fighting system.
Design, manufacturing, replacement and installation of fixed roof for 2 x 2000 m3 tanks.
Sandblasting and paint works for 4 x 2000 m3 tanks.
Construction of a new 5000 m3 fuel-oil tank with integrated piping system to site.
2021 - 2022
KAR GROUP ERBIL REFINERY
FUEL OIL TANK (TK-02-B), 5000 M 3 –MAJOR MAINTENANCE
Removal and Reconstructions Fixed roof plates & Annular plates of the tank.
Surface preparation & Coating for new Fixed roof, Central column, annular and bottom plates of the tank.
New Insulation and New Jacketing Installation for Externally of the tank.
Installing and Welding New Difference Size Nozzles.
Crude OIL TANK (TK-01B), 5000 M 3 – MAINTENANCE
Foam dam plates installation and welding.
Surface preparation & Coating for New Foam Dam, two Guiding poles and inside the Shell plates.
Storage Tank (V - 121) and (TK - 2403) – SURFACE PREPERATION & COATING
Internally Sandblasting and Painting
2022 - 2023
Gasoline Tank (TK-12-A), 2000 M 3 – Dismantling the existing corroded tank
Remove fixed roof plate and fixed Structure of the Tank.
Remove the Internal Floating roof of the tank Including floating roof seal.
Remove Shell plates, including Cooling water system, Foam line and foam chamber, Stair way and Handrails, Charis Support)
Remove Bottom and Annular plates, including drain line, drain pit, Anodes and anodes supports.
Diesel Tank (TK-04-B), 3000 M3 – MAJOR MAINTENANCE & REPAIR
Remove all bottom and annular plates, drain line, anodes and anodes support, Remove remnant weld on internal shell plate surface.
Construct the new Bottom and Annular plates, Center support column for the roof structure, new seal for foundation of the tank and Name plate.
Repair stairway, handrail and stair gratings
Upgrading firefighting system (top water-cooling ring line, foam chambers and pipes.
Sandblasting and Painting for Internally & Externally of the Tank.
INSULATION INSTALLATION OF THE NEW 4" FUEL OIL PIPING SYSTE
4" Pipeline insulation (Insulation Materials Stone wool)
Aluminum jacketing for covering Stone wool insulation.
CRUDE TANK (TK-01-G), 15000 M 3 – PARTIAL PAINTING WORKS (MAINTENANCE STAGE)
Surface preparation and Coating for tank internally (first shell course, bottom plates, annular plates).
Surface preparation and Coating for tank externally (EX-floating roof and Guide pole including foam dam, floating roof stairs., all floating roof legs and manholes).
Surface preparation and Coating for tank internally (first shell course, bottom plates, annular plates).
2023 - 2024
Sour Naphtha Tank (TK-03-C), 3000 M 3 – MAJOR MAINTENANCE & REPAIR
Remove the tank internal floating roof, all existing anodes and supports.
Engineering reviewing and constructing New Drawings.
Construct new internal floating roof (Single Deck type), top cooling ring, foam pipeline, new seal for tank foundation, guiding polies for radar (tank level indicator), cable tray support.
Repair tank bottom and Annular plates, tank center column support.
Upgrading firefighting system.
New design and Updating the As-built drawings for the tank.
Gasoline Tank (TK-12-A), 2000 M 3 – Reconstruct (Rebuilt) Storge Tank.
Engineering reviewing for Original Tank Design.
New design and Updating the As-built drawings for the tank.
Repair foundation of the tank and leveling.
Construct Base plate (Bottom & Annular), Shell plates including manway, shell chairs support, Top ring (wind girder), foam pipeline, cooling line system, guiding pole for Radar.
Construct internal Floating roof, fixed roof structures & fixed roof Plates of the tank.
Surface preparation and Coating for Internal & external surface of the Tank.
Construct Seal for the tank foundation, name plate for tank
Gasoline Tank (TK-012-F), 3000 M 3 – Dismantling the Exploded tank in KAR-2 Refinery.
Applications of painting system in process piping, and General Equipment, structures and firefighting system in KAR Refinery.
Installation of thermal insulation in process piping and General Equipment in KAR GROUP Refinery.
2024 - 2025
Nozzles fabrication on the water tanks in KAR GROUP 1, 2 & 3.
Construct Nozzles on the Shell plate (Nozzles size: 6"/ 150#).
Coating nozzles and damaged painting area on shell plate.
Sandblasting and painting of water tank pipelines.
Repair condensate tank TK-2403. Unit 3 - KAR 1.
Installation of thermal insulation on the heat exchangers E-211 A/B/C UNIT 1 KAR1.
Maintenance and Repair of Slop Tank (TK-06-B).
Remove Handrails and platform.
Repair tank shell plate top ring (wind girder), Shell welding Joint.
Repair anti-rotation roller on the floating roof.
Construct the cable tray support in shell plate for lighting, earthing and instrumentation cable.
Installing cathodic protection on bottom plate.
Installing Gate valve with gasket, bolt and nut for all tank Nozzles.
Surface preparation and Painting for the internal surface of the tank.
Surface preparation and Painting for the external surface of the tank.
Surface preparation and Painting for Tank Pipelines.
Major Repair of Gasoline Tank (TK-012-B).
Dismantling the Fixed roof, shell courses, Floating roof and Bottom plate.
New design from internal floating roof to external floating roof and Updating the As-built drawings for the tank.
Re-construct Bottom plate, all shell courses, and top ring.
Construct New single deck external floating roof.
Construct cooling line system, foam line system including supports.
Construct floating roof mechanical rim seal (primer seal & secondary seal).
Construct new seal for the tank foundation.
Construct the cable tray support in shell plate for instrumentation and lighting & earthing cable.
Installing cathodic protection on bottom plate.
Surface preparation and Painting for the internal surface of the tank.
Surface preparation and Painting for the external surface of the tank.
Surface preparation and Painting for Tank Pipelines.
One of Kurdistan’s and Iraq’s Best Engineering and Construction Company